|
Project: Hyatt Carpark and Pool Building a suspended concrete swimming pool was the key challenge of this project. Scarbro also carried out the insitu concrete and formwork installation and placed all the precast concrete components.
| Location: |
Cnr Waterloo Quadrant & Princess Street, Auckland City |
|
Architect: |
- |
| Description: |
Five-level concrete carpark and pool structure |
|
Engineer: |
Holmes Consulting Group |
| Client: |
Walter Construction Ltd |
|
Approx. Value: |
$1.0 million dollars | |